loading
Jinma Rides 4d simulator Supply for sale2 1
Jinma Rides 4d simulator Supply for sale2 1

Jinma Rides 4d simulator Supply for sale2

Brand:
GOLDEN HORSE
Place of origin:
Guangdong, China
Payment:
L/C, D/A, D/P, T/T, Western Union
Delivery time:
After 20 days
Design Lifetime:
1 set
Inquiry
4d simulator description
4d simulator Exquisite material selection, fine workmanship, complete functions, high quality, safety and environmental protection, durability, convenient disassembly and assembly, flexible assembly, etc., are sold well in domestic and foreign markets, and have won the unanimous approval of domestic and foreign customers.
Jinma Rides 4d simulator Supply for sale
Jinma Rides 4d simulator Supply for sale
4d simulator SPECIFICATIONS
MOQ:1 set
Payment:L/C, D/A, D/P, T/T, Western Union
Place of origin:Guangdong, China
Brand:GOLDEN HORSE
Delivery time:After 20 days
Start port:China
Suggested Videos
Contact us
we welcome custom designs and ideas and is able to cater to the specific requirements. for more information, please visit the website or contact us directly with questions or inquiries.
you might like
Ready to work with us?
Owns 4 production bases (R&D of Major Rides, R&D of Immersive Rides, fabrication of Roller Coaster), 2 international branches in HK(China) and Switzerland for the rides design under EN and ASTM standards.
Contact us
Tel:  (+86) 760 - 2813 2780 
        (+86) 760 - 2813 2738
Address:  No.5 Yanjiang East 3rd Road, Torch Development Zone, Zhongshan, Guangdong, China

The company's stock is traded on Shenzhen Stock Exchange. ( Jinma Rides )
Copyright © 2026 Jinma Rides - www.jinmarides.com | Sitemap
Customer service
detect