loading

The Leading Amusement Ride Manufacturer in China.

IMMERSIVE RIDES

How to manage the lighting of theme park amusement equipment

by:Jinma Rides     2022-10-20
How to manage the lighting of theme park amusement equipment


282
2021/9/26 4:34:26



For the lighting design of the theme park, after the plan meets the effect photos, the actual implementation is the real assessment content. Whether it is the integrity of the drawings, cost control, and energy-saving requirements, all aspects need to be designed and considered by our lighting practitioners. For example, there are several pictures of Shenyang Regao Theme Park below. The combination of effect and implementation is relatively good. Whether it is the selection of light color and the requirements for the shape and concealment of lamps, they are as unified as possible with the theme.


Question 1: The theme of the park should be constantly changing. How does the lighting cooperate with the participation?





Usually. It is common practice to develop theme parks in stages. Including the Disneyland in Orlando, USA, it has also been developed and constructed for decades. Regardless of the content, theme or the development and construction of the park, lighting is also considered in stages and in batches. Like Chimelong, which opened earlier in Guangzhou, its model is more animal-themed. After several years of development, 4D and 5D theaters have been gradually introduced since last year, and the corresponding lighting must also be matched accordingly.





Question 2: How can the cultural tourism park project be integrated with other projects from the beginning of the project and proceed further? What kind of research materials are needed, or how to do this research?





In terms of the recording time point of cultural tourism projects, it can be divided into two categories: one is reconstruction and expansion projects, and the other is newly built projects. For reconstruction and expansion projects, we should try our best to check and fill in the gaps to ensure that the theme effect is in place, not just do it all and make it bright. The sooner the new project is involved, the better, communicate more with the owners and other parties, understand the theme content of the familiar design, interpret the language and expectations of the design of each theme, and maintain the consistency of the design effect.






This is a point. The second point is to see the synchronization with it. The lighting just mentioned involves a lot of coordination. There are many involved, one is packaging, the other is landscape. The landscape plan is also a landscape design that begins after the architectural plan is completed. The packaging is also such a condition for lighting design. When we got the architectural plan, we also began to consider the needs of lighting design. Then, in this process, cooperate with the landscape and packaging scheme to see if the conditions and resources they provide us can achieve the final effect.





Question 3: What do you think are the key points and difficulties to be dealt with in this lighting research process, and how to deal with them?





In the process of conducting research, it is recommended to focus on research directions. Including functional lighting, landscape lighting, packaging effect lighting, amusement equipment lighting, etc., these parts are considered as a whole. Then, in the process of designing, the planning and design of step-by-step decomposition actions are carried out.


From my personal understanding, the real focus and difficulty is to cooperate more with communication.





Question 4: What are the requirements for the lighting control of the entire park, will it be very complicated?





For lighting control, it is necessary to provide corresponding requirements with the operation department. First of all, you need to confirm which areas need to be operated at night. In terms of equipment, queuing and evacuation, it is still based on the principle of function-based and energy-saving second. Different areas and contents have different lighting night operating hours.


At the implementation level, the existing technical level can meet the needs of the park for lighting control.
Custom message
Chat Online
Chat Online
Leave Your Message inputting...
Sign in with: