loading

The Leading Amusement Ride Manufacturer in China.

IMMERSIVE RIDES

The electrical system of small playground equipment belongs to the core operation

by:Jinma Rides     2021-08-20
For small playground equipment, logistics is used for delivery, so the first step in the inspection is to unload the goods. When unloading the goods, workers should be careful to handle them with care to avoid secondary damage. At the same time, they should check the appearance and integrity of the small playground equipment parts to avoid wrong delivery.
If there is a damage problem, it should be solved directly with the manufacturer or on-site installer depending on the degree. The second is to check the installation of the whole machine or the fixed position of the embedded device. This part is the foundation of the foundation. If there is a problem in this aspect, it is a waste of time and effort in the follow-up links.
Then is the inspection of the normal operation of the electrical system and transmission of the small playground equipment. This is the core operation. Once this problem occurs, it must be carefully resolved. From a safety point of view, it is very necessary to install the ground wire of the whole amusement project and the electric box, and this aspect should be emphatically checked.
Of course, no matter which device you buy, it must be equipped with an instruction manual and a certificate. Don't underestimate these two contents. This is the follow-up government inspection and post-maintenance that must be considered. Remember: No matter how good it is, it is better to test the machine on the spot. When the small playground equipment is installed and left idling for more than one hour, there is no obvious abnormal noise or defect to prove that you have bought this equipment.
Custom message
Chat Online
Chat Online
Leave Your Message inputting...
Sign in with: